Project Highlights:

  • 75,000 CY of Lake Excavation
  • 127,000 CY of Onsite Fill Movements
  • 3,000 LF of Lake Slope Grading
  • Over 3,000 LF of LWDD Canal Grading
  • 3,000 LF of Deep Storm Drainage
  • 1,000 LF of Exfiltration Trench Installation
  • New Lift Station with 1,000 LF of Force Main
  • 3,000 LF of New Water & Fire Mains
  • Aerial Water & Force Main Crossings over LWDD Canal
  • Direction Boring of Water & Force Mains under US-441
  • Over 18,000 SY of Asphalt Pavement
  • Over 10,000 SF of Sidewalks and over 5,000 LF of Curbs
  • Installations of (3) New Turn Lanes within FDOT ROW


Project:
BBX Logistics Delray
location:
Delray Beach, FL
Client:
Arco-Murray